State sponsored
TX-SB 6 · Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.
Named sponsor in the tracked public record
Evidence basis: stored_metadata · observed 2025-06-20
Inspect source evidence ↗