2025-06941 · Final rule

Building for the Future Through Electric Regional Transmission Planning and Cost Allocation

Jurisdiction
Federal
Current status
Final Rule
Issuing body / sponsor
Energy Department

Verify the effective date, covered entities, and operative text.

Latest action

Order on rehearing and clarification.

Apr 28, 2025

Subject areas

EnergyGrid ReliabilityRatepayer

Policy mechanisms

Grid & interconnectionUtility rate / large-load tariff

Tracker tags, not legal conclusions.

Quick summary

In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission…

Read full summary

In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs.

Source-provided or tracker summary; not operative legal text.

Linked record: federalregister.gov. Inspect the source before relying on the tracker’s interpretation.