Compare policy approaches
Put comparable state bills, federal bills, and regulatory actions side by side.
Choose policies to compare
Select two to four tracked items. This is a neutral comparison of policy approaches, not legal advice.
Side by side view
How this comparison worksDimensions, gaps, and why there is no single score
What is compared: status, jurisdiction, and the policy mechanism and topic signals attached to each tracked record. Mechanism and topic rows show whether a signal was detected for each record.
Signals are text derived. Mechanism rows come from deterministic rules over the record’s title, summary, and status; topic rows are AI classified against a fixed vocabulary. They are triage aids, not legal readings of the underlying law.
A dash means “not detected,” not “absent.” A blank cell means the signal was not found in the tracked text. The policy may still address it in provisions not captured here. Confirm against the source record and full text.
No composite score. These are heterogeneous federal and state measures at different stages; a single “strongest” number would hide the tradeoffs it claims to summarize. The comparison surfaces dimensions and lets you weigh them, rather than ranking the records for you.
| Dimension | StateNJ-A2770Establishes surcharge for electric public utility service to certain data centers during certain periods; establishes "Grid Modernization Fund" in BPU. | CongressHR-10539Integrated Local, Regional, and Interregional Transmission Planning Act of 2026 | StatePA-SB 1469An Act amending Title 66 (Public Utilities) of the Pennsylvania Consolidated Statutes, in rates and distribution systems, providing for large load hyperscale data center tariffs. | State executiveMD-EO-01.01.2026.16Executive Order 01.01.2026.16 establishes responsible data-center development review |
|---|---|---|---|---|
| Threshold | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source |
| Covered entity | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source |
| Energy obligation | Not established in tracked text | Grid/interconnection signal detected; inspect source passage. | Grid/interconnection signal detected; inspect source passage. | Not established in tracked text |
| Water obligation | Not established in tracked text | Not established in tracked text | Not established in tracked text | Not established in tracked text |
| Cost responsibility | Not established in tracked text | Not established in tracked text | Rate or incentive signal detected; allocation terms require source review. | Rate or incentive signal detected; allocation terms require source review. |
| Siting authority | Not established in tracked text | Not established in tracked text | Not established in tracked text | Not established in tracked text |
| Community role | Not established in tracked text | Not established in tracked text | Not established in tracked text | Not established in tracked text |
| Disclosure requirement | Not established in tracked text | Disclosure/reporting signal detected; inspect source passage. | Not established in tracked text | Disclosure/reporting signal detected; inspect source passage. |
| Enforcement | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source |
| Effective date | Last tracked action: 2026-01-13; not necessarily an effective date. | Last tracked action: 2026-09-24; not necessarily an effective date. | Last tracked action: 2026-09-24; not necessarily an effective date. | Last tracked action: 2026-09-23; not necessarily an effective date. |
| Exceptions | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source | Not yet structured; inspect the primary source |
| Status | Introduced, Referred to Assembly Telecommunications and Utilities Committee | Referred to the House Committee on Energy and Commerce. | Referred to Consumer Protection & Professional Licensure | Executive Order |
| Jurisdiction | NJ | IL | PA | MD |
| Policy signals | Disclosure & reportingGrid & interconnection | Grid & interconnectionUtility rate / large-load tariff | Disclosure & reportingUtility rate / large-load tariff | |
| Disclosure & reporting | — | ✓ | — | ✓ |
| Utility rate / large-load tariff | — | — | ✓ | ✓ |
| Grid & interconnection | — | ✓ | ✓ | — |
| Topics | EnergyGrid ReliabilityRatepayer | EnergyGrid ReliabilityRatepayerSiting & Land Use | EnergyGrid ReliabilityRatepayer | CarbonCertification & StandardsEnergyGrid ReliabilityJob CreationRatepayerSiting & Land UseWater |
| energy | ✓ | ✓ | ✓ | ✓ |
| water | — | — | — | ✓ |
| carbon | — | — | — | ✓ |
| certification standards | — | — | — | ✓ |
| job creation | — | — | — | ✓ |
| siting land use | — | ✓ | — | ✓ |
| ratepayer | ✓ | ✓ | ✓ | ✓ |
| grid reliability | ✓ | ✓ | ✓ | ✓ |
Signals are text derived triage aids. Read the source record and full text before reaching a policy conclusion.