Evidence Intelligence

Understand the policy. Then follow the evidence.

Read the status, operative signals, formal actors, comparable approaches, and evidence gaps before opening the relationship map.

Policy intelligence brief

TX-SB 6 — Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.

Establishes planning, interconnection, financial-assurance, cost-allocation, and emergency-curtailment provisions for large electrical loads including data centers.

Legal stateEnacted or issuedA bill is not law unless the source record shows enactment.
JurisdictionTexasState-source record
Latest recorded action2025-06-2006/20/2025 E Effective immediately
Primary sourceStateOriginal public record linked

What the evidence says

Key findings

01
How it operates

Grid & interconnection

Determines whether and how fast a data center can actually get power, and who builds and pays for the transmission upgrades.

Comparable precedents

Related approaches worth comparing

Selected by shared tracked mechanisms or themes, with cross jurisdiction examples prioritized. Similarity is not legal equivalence.

Refine the relationship evidence
Relationship depth
Show node types

Relationship map

TX-SB 6 evidence graph

Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.

12 nodes · 11 evidenced edges
Policy record 1Policy theme 5Policy mechanism 1Documented actor 2Policy family 1Jurisdiction 1Original source 1
explicitly concerns: Theme named in the title or stored summaryexplicitly concerns: Theme named in the title or stored summaryexplicitly concerns: Theme named in the title or stored summaryclassified under: Fixed-vocabulary topic classificationclassified under: Fixed-vocabulary topic classificationsignals mechanism: Mechanism signal derived from the tracked record textapplies in: Jurisdiction recorded for this source typedocumented by: Original source URL stored with the policy recordsponsored: Named sponsor in the tracked public recordsponsored: Named sponsor in the tracked public recordmember of family: exact title companionPolicy recordTX-SB 6Relating to the planning fo…TX-SB 6: Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.Policy themeEnergyExplicit record textEnergy: Explicit record textPolicy themeWaterExplicit record textWater: Explicit record textPolicy themeGrid ReliabilityExplicit record textGrid Reliability: Explicit record textPolicy themeRatepayerAI-assisted policy themeRatepayer: AI-assisted policy themePolicy themeSiting & Land UseAI-assisted policy themeSiting & Land Use: AI-assisted policy themePolicy mechanismGrid & interconnectionText-derived policy signalGrid & interconnection: Text-derived policy signalJurisdictionTexasState policy jurisdictionTexas: State policy jurisdictionOriginal sourceStateOriginal public sourceState: Original public sourceDocumented actorKingpersonKing: personDocumented actorSchwertnerpersonSchwertner: personPolicy familyRelating to the planni…TXRelating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.: TX

The visual map is hidden on small screens; the complete relationship receipts remain available below.

Inspectable edges

Relationship receipts

Each edge states what was observed and why it appears. An edge never implies private influence, support, opposition, or causation.