Evidence Intelligence
Understand the policy. Then follow the evidence.
Read the status, operative signals, formal actors, comparable approaches, and evidence gaps before opening the relationship map.
Policy intelligence brief
TX-SB 6 — Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.
Establishes planning, interconnection, financial-assurance, cost-allocation, and emergency-curtailment provisions for large electrical loads including data centers.
What the evidence says
Key findings
Grid & interconnection
Determines whether and how fast a data center can actually get power, and who builds and pays for the transmission upgrades.
Energy · Water · Grid Reliability
These themes are supported by explicit words in the title or stored summary, not graph proximity.
King · Schwertner
sponsored: King; sponsored: Schwertner
Comparable precedents
Related approaches worth comparing
Selected by shared tracked mechanisms or themes, with cross jurisdiction examples prioritized. Similarity is not legal equivalence.
Refine the relationship evidence
Relationship map
TX-SB 6 evidence graph
Relating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.
The visual map is hidden on small screens; the complete relationship receipts remain available below.
Inspectable edges
Relationship receipts
Each edge states what was observed and why it appears. An edge never implies private influence, support, opposition, or causation.
TX-SB 6explicitly concernsEnergy
Theme named in the title or stored summary · Basis: explicit text match; not graph inference · Observed 2026-10-13Inspect supporting source ↗TX-SB 6explicitly concernsWater
Theme named in the title or stored summary · Basis: explicit text match; not graph inference · Observed 2026-10-13Inspect supporting source ↗TX-SB 6explicitly concernsGrid Reliability
Theme named in the title or stored summary · Basis: explicit text match; not graph inference · Observed 2026-10-13Inspect supporting source ↗TX-SB 6classified underRatepayer
Fixed-vocabulary topic classification · Basis: AI-assisted tracker classification; inspect the source before relying on it · Observed 2026-10-13Inspect supporting source ↗TX-SB 6classified underSiting & Land Use
Fixed-vocabulary topic classification · Basis: AI-assisted tracker classification; inspect the source before relying on it · Observed 2026-10-13Inspect supporting source ↗TX-SB 6signals mechanismGrid & interconnection
Mechanism signal derived from the tracked record text · Basis: deterministic text rule; not a legal conclusion · Observed 2026-10-13Inspect supporting source ↗TX-SB 6sponsoredSchwertner
Named sponsor in the tracked public record · Basis: stored metadataInspect supporting source ↗TX-SB 6member of familyRelating to the planning for, interconnection and operation of, and costs related to providing service for certain electrical loads and to the generation of electric power by a water supply or sewer service corporation.
exact title companion · Basis: exact normalized title within TX, session 2025-2026 · Observed 2026-10-13Inspect supporting source ↗