Evidence Intelligence
Understand the policy. Then follow the evidence.
Read the status, operative signals, formal actors, comparable approaches, and evidence gaps before opening the relationship map.
Policy intelligence brief
DE-SB 308 — AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO THE LOAD FORECAST ACCOUNTABILITY ACT.
This legislation shall be known and may be cited as the “Load Forecast Accountability Act.” Recent reports by PJM Interconnection, L.L.C. (PJM), have highlighted that electricity demand across the PJM footprint, including Delaware, is projected to grow due to data centers, electrification of vehicles and buildings, and other large load additions. PJM recently projected that, by 2030, PJM expects to add 32 GW of load to the grid – 30 GW of which is attributable to data centers. PJM relies upon load forecasts submit…
What the evidence says
Key findings
Disclosure & reporting · Grid & interconnection
Forces a data center’s energy, water, and impact data into public view, so regulators, ratepayers, and communities can see figures operators would otherwise keep private. Determines whether and how fast a data center can actually get power, and who builds and pays for the transmission upgrades.
Energy · Grid Reliability
These themes are supported by explicit words in the title or stored summary, not graph proximity.
Hansen
sponsored: Hansen
Comparable precedents
Related approaches worth comparing
Selected by shared tracked mechanisms or themes, with cross jurisdiction examples prioritized. Similarity is not legal equivalence.
Refine the relationship evidence
Relationship map
DE-SB 308 evidence graph
AN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO THE LOAD FORECAST ACCOUNTABILITY ACT.
The visual map is hidden on small screens; the complete relationship receipts remain available below.
Inspectable edges
Relationship receipts
Each edge states what was observed and why it appears. An edge never implies private influence, support, opposition, or causation.
DE-SB 308explicitly concernsEnergy
Theme named in the title or stored summary · Basis: explicit text match; not graph inference · Observed 2026-10-13Inspect supporting source ↗DE-SB 308explicitly concernsGrid Reliability
Theme named in the title or stored summary · Basis: explicit text match; not graph inference · Observed 2026-10-13Inspect supporting source ↗DE-SB 308classified underCertification & Standards
Fixed-vocabulary topic classification · Basis: AI-assisted tracker classification; inspect the source before relying on it · Observed 2026-10-13Inspect supporting source ↗DE-SB 308classified underRatepayer
Fixed-vocabulary topic classification · Basis: AI-assisted tracker classification; inspect the source before relying on it · Observed 2026-10-13Inspect supporting source ↗DE-SB 308signals mechanismDisclosure & reporting
Mechanism signal derived from the tracked record text · Basis: deterministic text rule; not a legal conclusion · Observed 2026-10-13Inspect supporting source ↗DE-SB 308signals mechanismGrid & interconnection
Mechanism signal derived from the tracked record text · Basis: deterministic text rule; not a legal conclusion · Observed 2026-10-13Inspect supporting source ↗DE-SB 308member of familyAN ACT TO AMEND TITLE 26 OF THE DELAWARE CODE RELATING TO THE LOAD FORECAST ACCOUNTABILITY ACT.
exact title companion · Basis: exact normalized title within DE, session 2025-2026 · Observed 2026-10-13Inspect supporting source ↗