Policy intelligence brief
2025-06941 — Building for the Future Through Electric Regional Transmission Planning and Cost Allocation
In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-…
What the evidence says
Key findings
Grid & interconnection · Utility rate / large-load tariff
Determines whether and how fast a data center can actually get power, and who builds and pays for the transmission upgrades. Changes who pays for the grid — shifting the cost of new power supply and upgrades toward large data-center loads instead of ordinary ratepayers.
Energy · Ratepayer · Grid Reliability
These themes are supported by explicit words in the title or stored summary, not graph proximity.
Energy Department
issued by: Energy Department
Comparable precedents
Related approaches worth comparing
Selected by shared tracked mechanisms or themes, with cross jurisdiction examples prioritized. Similarity is not legal equivalence.
Refine the relationship evidence
Relationship map
2025-06941 evidence graph
Building for the Future Through Electric Regional Transmission Planning and Cost Allocation
The visual map is hidden on small screens; the complete relationship receipts remain available below.
Inspectable edges
Relationship receipts
Each edge states what was observed and why it appears. An edge never implies private influence, support, opposition, or causation.
2025-06941explicitly concernsEnergy
Theme named in the title or stored summary · Basis: explicit text match; not graph inference · Observed 2026-10-13Inspect supporting source ↗2025-06941explicitly concernsRatepayer
Theme named in the title or stored summary · Basis: explicit text match; not graph inference · Observed 2026-10-13Inspect supporting source ↗2025-06941explicitly concernsGrid Reliability
Theme named in the title or stored summary · Basis: explicit text match; not graph inference · Observed 2026-10-13Inspect supporting source ↗2025-06941signals mechanismGrid & interconnection
Mechanism signal derived from the tracked record text · Basis: deterministic text rule; not a legal conclusion · Observed 2026-10-13Inspect supporting source ↗2025-06941signals mechanismUtility rate / large-load tariff
Mechanism signal derived from the tracked record text · Basis: deterministic text rule; not a legal conclusion · Observed 2026-10-13Inspect supporting source ↗2025-06941applies inUnited States
Jurisdiction recorded for this source type · Basis: stored source metadata · Observed 2026-10-13Inspect supporting source ↗2025-06941documented byFed. Register
Original source URL stored with the policy record · Basis: primary source link · Observed 2026-10-13Inspect supporting source ↗2025-06941issued byEnergy Department
Issuing agency named in the tracked public record · Basis: stored metadataInspect supporting source ↗2025-06941member of familyBuilding for the Future Through Electric Regional Transmission Planning and Cost Allocation
standalone · Basis: standalone federal_register record · Observed 2026-10-13Inspect supporting source ↗