Policy intelligence brief

2025-06941 — Building for the Future Through Electric Regional Transmission Planning and Cost Allocation

In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-…

Legal stateEnacted or issuedVerify the effective date, covered entities, and operative text.
JurisdictionUnited StatesFederal-source record
Latest recorded action2025-04-28Order on rehearing and clarification.
Primary sourceFed. RegisterOriginal public record linked

What the evidence says

Key findings

01
How it operates

Grid & interconnection · Utility rate / large-load tariff

Determines whether and how fast a data center can actually get power, and who builds and pays for the transmission upgrades. Changes who pays for the grid — shifting the cost of new power supply and upgrades toward large data-center loads instead of ordinary ratepayers.

Comparable precedents

Related approaches worth comparing

Selected by shared tracked mechanisms or themes, with cross jurisdiction examples prioritized. Similarity is not legal equivalence.

Refine the relationship evidence
Relationship depth
Show node types

Relationship map

2025-06941 evidence graph

Building for the Future Through Electric Regional Transmission Planning and Cost Allocation

10 nodes · 9 evidenced edges
Policy record 1Policy theme 3Policy mechanism 2Documented actor 1Policy family 1Jurisdiction 1Original source 1
explicitly concerns: Theme named in the title or stored summaryexplicitly concerns: Theme named in the title or stored summaryexplicitly concerns: Theme named in the title or stored summarysignals mechanism: Mechanism signal derived from the tracked record textsignals mechanism: Mechanism signal derived from the tracked record textapplies in: Jurisdiction recorded for this source typedocumented by: Original source URL stored with the policy recordissued by: Issuing agency named in the tracked public recordmember of family: standalonePolicy record2025-06941Building for the Future Thr…2025-06941: Building for the Future Through Electric Regional Transmission Planning and Cost AllocationPolicy themeEnergyExplicit record textEnergy: Explicit record textPolicy themeRatepayerExplicit record textRatepayer: Explicit record textPolicy themeGrid ReliabilityExplicit record textGrid Reliability: Explicit record textPolicy mechanismGrid & interconnectionText-derived policy signalGrid & interconnection: Text-derived policy signalPolicy mechanismUtility rate / large-l…Text-derived policy signalUtility rate / large-load tariff: Text-derived policy signalJurisdictionUnited StatesFederal policy jurisdictionUnited States: Federal policy jurisdictionOriginal sourceFed. RegisterOriginal public sourceFed. Register: Original public sourceDocumented actorEnergy DepartmentagencyEnergy Department: agencyPolicy familyBuilding for the Futur…USBuilding for the Future Through Electric Regional Transmission Planning and Cost Allocation: US

The visual map is hidden on small screens; the complete relationship receipts remain available below.

Inspectable edges

Relationship receipts

Each edge states what was observed and why it appears. An edge never implies private influence, support, opposition, or causation.